Industrial Installation for Irradiation of Wires, Cables, and Plastic Tubes based on ILU-8 Accelerator

The installation is based on ILU-8 accelerator put into operation in 1995 in Korea. Annual operating time over 7000 hours. Accelerator with 4-side irradiation system and underbeam equipment placed inside compact local radiation shielding
Local radiation shielding with ILU-8 accelerator inside

ILU-8 accelerator inside shielding

4-side irradiation system allows to increase beam usage efficiency comparing with 2-side irradiation. No cable twist
Main Parameters:

 Energy range, MeV 0.5-1.0 
 Beam power, kW up to 30


Comments